Isaac Newton
Project Jan De Nul

Engineering of world's largest multipurpose cable laying vessel

  • Offshore, wind, oil and gas

Want more information about this project?

Contact us

MULTI.engineering designed the cable laying system for the new-built multipurpose vessel Isaac Newton. Later on some adjustments had to be made to the vessel.

A giant in offshore cable installation

The vessel can install up to 10,700 tons of cable and is thereto equipped with a 7,400 ton capacity turntable above deck and a 5,000 ton capacity turntable below deck.

MULTI's expertise made it possible to gain a good insight into the actual scope, avoiding unnecessary activities.

Download case

Because of the familiarity with the project, MULTI.engineering was able to carry out the additional work quickly and effectively.